Coles Wind Road work for 6/8/26
Surface milling closes lanes on 1400E. Surface rock builds close 1820E channels.

Emergency Vehicles, Mail Carriers, School Busses and Local Residents within the road closures.Will be granted access.Scheduled work subject to change due to weather/site conditions.Road closed on 1400E from 1600N to 1500N for pre pulverization. Road closed on 1820E from 1700N to 1600N until 6/10/26 for paving 3” cap rock. Road closed on 1600N from IL-130 to 1875E until 6/10/26 for paving 3” cap rock. Road closed on 1800E from 1600N to 1400N/South street until 6/15/26 for cement cure and pre pulverization. Road closed on 1850E from 1400N to 1300N until 6/12/26 for cement cure. Road closed on 1400N from 1800E to 2000E until 6/12/26 cement cure. Road closed on 1500N from 1700E to 1800E until 6/15/26 for pre pulverization and cement stabilization. Road closed on 1770E from 1400N to 1300N until 6/12/26 for cement cure. Flagmen will be used for any short-term partial lane closures. Dirtworks will continue cleaning out culverts. Dunn Company will continue cement stabilization and pre pulverization. Evergreen will continue paving 3” agg cap.