Coles Wind Road work for 4/9/26
Overnight trench blocks hit 1700E. Widespread culvert detours on 1500N.

Emergency Vehicles, Mail Carriers, School Busses and Local Residents within the road closures.Will be granted access.Scheduled work subject to change due to weather/site conditions.OVERNIGHT CLOSURE on 1700E from 1900N to 1800N due to open trench. Road closed to thru traffic on 1500N from IL-130 to 1100E until 4/27/26. Road closed on 1500N from IL-130 to 1700E for culvert install C-33 and I-139. Road closed on 1400N from 1300E to 1400E for culvert install C-07 and I-167. Road closed on 1400E from 1700N to 1600N for placing blister patches. Road closed on 1600N from IL-130 to 1400E for placing blister patches. Road closed on 1700N from IL-130 to 1900E for trenching. Road closed on 1700N from IL-130 to 1300E for placing dirt embankment. Road closed on 1800N from IL-130 to 1700E for trenching and agg base widening. Flagmen will be used for any short-term partial lane closures while prepping for future culvert installs.Dirtworks will continue trenching and installing culverts.Dunn Company will continue cement stabilization and pre pulverization.