Partial lane closure on 1800Nfrom IL-130 to 1300E for grading ditches. Road closure on 1400E from 1400N to1500N for placing a HMA patch at I-146. Road closure on 1600N from 1400E to1500E for placing HMA patches at C-62 and C-63. Road closure on 1500E from1600N to 1500N for placing a HMA patch at C-137. Flaggers will be utilized forany short term partial lane closures.

Dirtworks will continueworking on grading and Evergreen will be installing HMA patches.

Thanks,

‍