Busses and Local Residents within the road closures.
Will be granted access.
Scheduled work subject to change due to weather/site conditions.
Road closed to thru traffic on 1500N from IL-130 to 1100E until 5/15/26. Road closed on 1700N from IL-130 to 1300E until 5/11/26 for laying oil and chip dust control. Road closed on 1700N from IL-130 to 1820E culvert install C-133. Road closed on 1600N from IL-130 to 1800E for culvert install C-56. Road closed on 1400E from 1800N to 1400N until 5/15/26 for cement stabilization and cement cure. Road closed on 1600N from IL-130 to 1300E until 5/15/26 for pre pulverization and cement stabilization. Road closed on 1800N from IL-130 to 1820E for pre pulverization. Road closed on 1700E from 1900N to 1800N for pre pulverization. Flagmen will be used for any short-term partial lane closures while prepping for future culvert installs.
Dirtworks will continue installing pipe culverts.
Dunn Company will continue cement stabilization and pre pulverization.
Evergreen will continue laying oil and chip dust control and hauling in rock to the Welcome Center.
Thanks.